Skip to content
Arquitetura do ImpossívelImpossible Architecture
Topic · 05 structures

Tunnels and railroads

Opening a way beneath a river, a sea or a mountain, or getting the train across what seemed impassable. In London, Marc Brunel dug the Thames Tunnel (1825–1843) with a cage of 36 cells, one for each miner, under a river crowded with ships, and it took 18 years. The Channel Tunnel (1987–1994) used 11 tunnel boring machines, six from England and five from France, and the two halves of the service tunnel met with a lateral offset of 36 cm.

In Switzerland, the Gotthard Base Tunnel crossed the Alps for 57 km, with up to 2,300 m of rock overhead: it is the longest railway tunnel in the world. In Brazil, the Santos–Jundiaí Railway took the train up the Serra do Mar with four inclined planes, steel cable and steam, and the Madeira-Mamoré Railroad laid track through more than 360 km of forest, swamp and rapids in the Amazon, where almost every worker came down with malaria.

In several of them, the death toll is the hardest part: on the Madeira-Mamoré it ranges from fewer than 2,000 to 6,000 or more, depending on the source. Each page shows the versions and does not pick one.

Drawing board

Structures on this topic

  • Straight track across a flooded swamp, with palm trunks under the line, men and horses in the background and low forest on both sides 07 Premieres Nov 19, 2026

    Madeira-Mamoré Railroad

    From Porto Velho to Guajará-Mirim, Rondônia, Brazil · 1907–1912

    How the Madeira-Mamoré Railroad got through swamp, rapids and malaria in the Amazon, and why its death toll runs from under 2,000 to 6,000 or more.

    BrazilRead the story →
  • Old sepia photograph: a double-track railway curves along a steep slope, with a stone wall on the left, a tunnel in the background, telegraph poles and the mist-covered valley on the right 13 Premieres Dec 31, 2026

    Santos–Jundiaí Railway

    Serra do Mar, between Santos and Jundiaí, by way of the city of São Paulo, São Paulo State, Brazil · 1860–1867

    How the São Paulo Railway, the Santos–Jundiaí line, beat the Serra do Mar in 1867 with four inclines, cable and steam, and why the idea is back in 2026.

    BrazilRead the story →
  • White cylindrical tunnel boring machine displayed in a roundabout garden, with the red wheel-shaped cutting head on the left and the French inscription Hommage aux bâtisseurs du tunnel on its body 14 Premieres Jan 07, 2027

    Channel Tunnel

    Under the Strait of Dover, between Folkestone, Kent, England, and Coquelles, Pas-de-Calais, France · 1987–1994

    How England and France bored the Channel Tunnel under the sea: 11 tunnel boring machines, a meeting measured in millimeters and an 80% cost overrun.

    WorldRead the story →
  • Old black-and-white engraving: an arched brick gallery receding into the distance, with side archways lit by lamps, pedestrians in top hats and two men pulling a cart on the stone floor 20 Premieres Feb 18, 2027

    Thames Tunnel

    Under the River Thames, between Rotherhithe and Wapping, London, England, United Kingdom · 1825–1843

    How Marc Brunel dug the Thames Tunnel, the first known to be finished under a navigable river, using a 36-cell shield, and why it took 18 years.

    WorldRead the story →
  • Inside a rock tunnel coated in shotcrete, the huge rust-colored circular cutterhead of a tunnel boring machine, full of openings; a worker in a helmet and coveralls stands beside it, reaching about a quarter of the way up the disc 31 Premieres May 06, 2027

    Gotthard Base Tunnel

    Beneath the Gotthard massif, between Erstfeld (canton of Uri) and Bodio (canton of Ticino), Alps, Switzerland · 1999–2016

    How Switzerland dug the Gotthard Base Tunnel, 57 km under the Alps, letting the mountain squeeze in on purpose in one stretch, for CHF 12.2 bn and 9 lives.

    WorldRead the story →
More

Other topics

The structures grouped by the problem they solved: bridges, skyscrapers, tunnels, stadiums, water.